Insights
Practical guides from our logistics, energy, infrastructure, commodities and procurement teams.
14, 16 or 20 ft truck, or a full container? How to choose the right vehicle
Small trucks, 20 ft and 40 ft FCL containers and low-bed trailers each fit a different load. Here is how to pick the right one and avoid paying for empty space.
What a turnkey solar installation partner handles, from survey to handover
A solar plant is built in stages. Here is what an installation subcontractor typically delivers at each one, and what to agree before work starts.
Substation works explained: wiring, panels, cabling and earthing
What substation works include on renewable and industrial projects, from control panel wiring to cable terminations and earthing, and how to keep them on schedule.
Project-specific procurement: getting metals, electrical items and equipment to site on time
How project procurement support works, which categories it covers, and the five things that keep materials from holding up your site.
Exporting agricultural commodities from India: from specification to shipment
The stages of an agricultural commodity export, from agreeing the specification to loading the container, and the documents that usually travel with it.
Planning excavation and road works for industrial and renewable project sites
Access roads, excavation, trenching and drainage set the pace of every project site. How to plan them so the rest of the work is not held up.
Tell us what you need moved, built or sourced
Email the right desk and we'll come back with a plan and a quote.